Keep your construction project on track with data you can trust. Each site capture is processed into detailed maps, 3D models, and measurable reports, delivering reliable updates from start to finish.
Aerial Advantage
Aerial Progress Tracking for Smarter Construction Management
Precise site documentation
High resolution imagery and mapping ensure that every update is verifiable and geo-referenced.
Progress you can measure
Track cut and fill, material volumes, surface areas, and distances directly from visual data.
Fewer site visits, faster decisions
Review accurate 3D models and maps remotely to save time and reduce travel.
Improved communication
Share visual progress updates with contractors, clients, and investors for transparent reporting.
Simple, repeatable, auditable
How Airmatix Progress Monitoring Works
Scheduled Aerial Capture
Flights are performed weekly, biweekly, or around key milestones to keep your records up to date.
Data Process & Analysis
Imagery is transformed into measurable 2D and 3D outputs through a survey-grade workflow.
Reporting & Delivery
Receive interactive progress reports, visual comparisons between capture dates, and downloadable files for documentation or analysis.
Trusted Accuracy
Accuracy and Data Integrity
Each dataset is geo-referenced using ground control and precision positioning methods (RTK/PPK) to achieve high accuracy. Deliverables are verified to ensure consistency across time, enabling confident measurement and reliable long term records for construction and engineering teams.